Work on the Air Range continues with a second coat of paint on the back wall (Target end) and the Target Light Baffle. The insulation and lining has been installed on the back wall at the Firing Line and the side wall at the entry door.
It is hoped that the final coat of paint can be applied to the baffle and back wall this Saturday and the lighting forward of the firing line installed next week.
It is also hoped that the insulation and cladding on the other end wall at the firing line can be installed on Saturday and the undercoat applied to all three walls at the Firing Line.