Scores appear on the Results page.
The working bee was called to repair the termite damaged wall between the Club kitchen and hall and "strip out" the Office in readiness for treatment and repair of the flooring in that area.
Thanks to the efforts of Michelle, Kaylene, Charles, Dick and Bob, the majority of the damaged framing was removed (There is still approx. 2.5 m of bottom plate to be removed) and the majority of new cypress pine framing installed. Another 2 hours or so next Saturday will see the framing completed in readiness for the pest controller to spray all the exposed timber framing and the floor area of the Office before the gyprock is re-installed on the walls, the new area painted and the trim all replaced.